Some forty SharePoint sites, about 46,000 files and not one tag in use. Engineering drawings tracked by folder name. We counted everything, planned where every file goes, rebuilt the structure, and built document control and search on top of it, all inside SharePoint.
More than half the sites were demos, tests or dormant. Status and title were empty on every file, and a quarter of them sat six folders deep or deeper. One group that meant almost everyone could edit HR, finance and intellectual property. Engineering already ran document control, but as folder names.
The business needed a clean home for its files and a way to find them. Engineering needed numbered drawings with revisions and reviews, because drawings were on the critical path for its next design phase.
A full scan and a move plan with a row for every file. A new structure of sites, libraries and tags, with the active content copied in. Then document control for engineering, one search across every site, a branded intranet, and a dashboard prototype for leadership.
We scanned every site, library, folder and permission, then wrote a move plan with a row for every file: where it goes, which folder, which tags, and why.
Every file, folder and permission entry. Nothing touched.
Destination, folder and tags for each file, with the reason it goes there.
Every library's proposed destination goes to the company to confirm or correct before anything moves.
Authors and dates kept. Every destination checked against the plan.
| Old location | Goes to | Decision | |
|---|---|---|---|
| Operations › Sales › Customers | Commercial › Customers | Customer record | New site |
| Projects › Drawings › Unit 1 | Projects › P-1001 › Drawings | Drawing · Mechanical | New site |
| Finance › Prior years › Audit | Archive › Finance | Audit paper | Archive |
| Marketing › Site tour videos | Media › Video library | Video | Media |
| Operations › Personal folder | Owner decides | Review | |
| Site Assets | Stays | Left |
Mock-up. Bar lengths and counts are rounded from the real plan; the rows are sample data.
Every file had a destination, and a reason, before anything moved.
Engineering documents get a number from a series, even before they're drawn. Revisions and reviews live in a register, and each document's status is written back onto the file. The register is SharePoint lists, and the files stay in their libraries.
A drawing's number, revision and reviews live in one register, not in a file name and an email thread.
| Number | Title | Rev | Status |
|---|---|---|---|
| DOC-0012 | Process diagram, main system | B | In review |
| DOC-0031 | Datasheet, main unit | 0 | Issued for construction |
| DOC-0019 | Sizing calculation | Planned due in 3 weeks | |
| DOC-0002 | Instrument index | 1 | Issued for construction |
| DOC-0004 | Start-up procedure | Overdue | |
| DOC-0118 | Frame drawing, imported | Legacy |
Mock-up with made-up document numbers and sample data.
A search page that reaches every site with the same filters, and a panel on each site to find, upload and tag. Both read the same ten columns, set up the same way on every site.
Mock-up with sample documents.
One search across every site, filtered by the same tags everywhere.
A prototype for leadership that joins finance, people, engineering documents and operations spend, with a what-if screen beside it. It's in review now.
An interactive prototype, in review with leadership. It's built to replace a cash spreadsheet and a spend workbook.
Mock-up with made-up figures.
The move ran as copies, with the original authors and dates written back. Then every destination folder was listed and compared with the plan, file by file. A run log isn't proof. A count is.
| Check, active content | Result |
|---|---|
| Files placed in the new sites | About 7,800 of 7,900 |
| Files showing the copy date instead of the original | 0 |
| Files missing a security tag | 0 |
| Filename collisions at the destination | 0 |
| Engineering and project files with a discipline | About 75%, up from about 15% |
| Files not placed, each one explained | About 100 |
The 100 or so: files changed at the source after the scan, which the final pass picks up, and a handful too large for the copy method, which move separately.
Nothing in document control can be built right until the libraries, columns and permissions are real, so that set the order. The move itself ran from a plan the company approved.
types of engineering document numbered from a series, with revisions and reviews in one register.
across every site, with the same tags and filters in every library.
Every move so far was a copy, checked file by file. The originals stay where they were.
Thirty minutes on what you have, where it should go, and what it would take to get there.